Personal project

Pose6D: 6D pose estimation from RGB

An RGB 6D pose estimator for any number of cameras. Ranked first for accuracy and for speed on the BOP Challenge IPD leaderboard.

1 min read

Active
Industrial parts on a table, with Pose6D estimates drawn over them as cyan outlines and coordinate axes

Pose6D is my 6D pose estimator for RGB cameras. It reaches state-of-the-art performance under industrial constraints.

Capability Pose6D
Input RGB images, any number of cameras
Training data Synthetic, rendered from CAD. No real data
Training time Under 1 hour per part
New part Working estimator in under 2 hours
Speed Real time, 7 to 15 Hz for one part

Pipeline

The pipeline itself is pretty conventional. Most of the work goes into bringing current techniques to pose estimation, and into using explicit uncertainty at every stage. The main stages are the detector, triangulation, 2D/3D mapping, fusion and refinement.

I'm now testing advanced filters to improve tracking, and running benchmarks on several datasets. More details coming soon.

Results

On the BOP Challenge IPD leaderboard, Pose6D ranks first for both accuracy and speed.

BOP IPD Pose6D Rank
Accuracy 0.972 AP #1
Speed, 10 parts 0.646 s per image #1
Grayscale IPD image of industrial parts on a calibration board, with estimated poses drawn as cyan outlines and coordinate axes
Figure 1. Pose6D estimates on an IPD image.
Grayscale IPD image of flat T-shaped parts and small folded brackets on a dark table, with estimated poses drawn as cyan outlines and coordinate axes
Figure 2. Part 18, the T-shaped part, on IPD.
Two IPD scenes side by side on calibration boards. Left, T-shaped parts among square plates and other clutter. Right, folded brackets, gears and small hooks. Estimated poses are drawn in cyan
Figure 3. Two more IPD scenes: part 18 in clutter (left) and other part types (right).
Two images side by side. Left, a bin of gear-shaped parts from XYZ-IBD. Right, household objects on a chessboard from YCB-V. Estimated poses are drawn in cyan on both
Figure 4. Estimates on XYZ-IBD (left) and YCB-V (right), from the benchmarks in progress.